Project Name | Owner/Operator | Order by | Scope |
---|---|---|---|
NEOM GHE Project (GHE) (650 T/ Day) | Air Product | ThyssenKrupp | Manpower for Engineering activites (Layout, Piping & SP3D Modeling Scope) for Electrolyser scope |
NEOM HIDC Project | Air Product | CPP India | SP-3D Catalogues, Stress analysis, 3D Model review, IFC Isometrics with BOM, Pipe support design & details, MTO for interconnecting DM water KOH System (FEP Lined GRV piping) |
NEOM GHE Project (GHE) (650 T/ Day) | Air Product | CPP India | SP-3D catalogues, Stress analysis including Module transportation case analysis, 3d Model review IFC Isometrics with BOM, pipe support design & details,MTO for KOH system (FEP lined GRV Piping), FEA study to check shear build up & relative thermal expansion of FEP / PP Liner, support Strength check. |
NEOM GHE Project (GHE) (650 T/ Day) | Air Product | CPP India | SP-3D catalouge, Stress analysis, 3D Model review, IFC Isometrics with BOM Pipe support design & details, for DM Water system (PP-R lined GRV piping) |
Casa Garande Green Hydogen Project | Air Product | CPP India | Stress analysis, 3D Model review, IFC Isometrics with BOM, Pipe support design & details, MTO for DM Water system (PP-R Lined GRV piping) |
Project | Compressor Package | PC | End Client | Scope |
---|---|---|---|---|
YEOSU NO.2 Complex Project | H2 Make up Compressor | NEA | LG CHEM | Detailed Engineering-3D model piping & Equipments, stress analysis, Structural fabrication drawings |
CHEVRON ICR UNIT 132/REF' Y MODERNISATION PROJECT | H2 Make up Compressor | NEA | BPCL | Detailed Engineering-3D model piping & Equipments, stress analysis, Structural fabrication drawings |
NRL Project | H2 Make up Compressor | NEA | NRL | Detailed Engineering- P & ID, Piping, SP-3D, SPPID |
NRL Project | SHU H2 Makeup Compressor | NEA | NRL | Detailed Engineering- P & ID, Piping, SP-3D, SPPID |
NRL Project | NRL Project - H2 Rich Gas Compressor | TKIS/Howden Solyvent | NRL | Detailed Engineering for carrier gas compressor - Piping/3D Modelling in SP3D/ Stress/Structural details dwg |
GAIL USAR | Hydrogen Compressor | NEA | GAIL USAR | Detailed Engineering for carrier gas compressor - Piping/3D Modelling in SP3D/ Stress/Structural details dwg |
GAIL USAR | Hydrogen Booster Compressor | NEA | GAIL USAR | Detailed Engineering for carrier gas compressor - Piping/3D Modelling in SP3D/ Stress/Structural details dwg |
CO2 Collection, Cleaning & liquification from Ethanol Plant - for Praj Industries / Manas Agro / Purti Group
Incinerator & Associated Ducting- Verentis Singapore
Exhaust Ducting & Stack for Fired heaters - JNK Heater
EED/Pre-bidding - Sugar Dust collection System - MSM Sugar Malaysia
Generic Green Ammonia FEED Project (545 MT/DAY) - Sepadu Tech Generic Green Ammonia FEED Project (545 MT/Day) - Sepadu Tech
Generic Green Methanol FEED Project (490 MT/Day) - Sepadu Tech
GRP- Piping System- Spray Nozzle & Header System
FEA analysis- Piping System
Pipe Support Design
Structural Detail Drawing
Cooling Media
PDMS Models STP formate
Structural Fabrication Drawings
FGD-Solapure System Thermal Power Project (2*660 MW)
FGD-Meja Thermal Power Project Phase Stage(2*660 MW)
FGD-Tanda Thermal Power Station 2 (2*660 MW)
FGD -JHAJJAR TPS- Stage 1 (2*550 MW)
FGD for Singrauli Super Thermal Power Stage I & II - 17 M Dia
FGD for Singrauli Super Thermal Power Stage I & II - 20 M Dia
FGD for Singrauli Super Thermal Power Stage I & II - 17.5 M Dia
FGD- Jhawarpur Super Thermal Power Station (2* 660MW)
FGD-Nagison II Thermal Power Plant
FGD for Bakaro A Thermal Power Station
Project | Owner | EPC | Licensor | Scope of Work |
---|---|---|---|---|
FGD-Super Thermal Power Project Stage- 1 (2*800 MW)-GADARWARA | NTPC Ltd | ISGEC Heavy Engg Ltd. | BABCOCK POWER ENVIRONMENTAL INC. | Detailed Engineering, Piping Surge, Stress analysis of CS + RL, FRP Piping |
FGD-Super Thermal Power Project Stage- 1 (3*800 MW)-KUDGI | NTPC Ltd | ISGEC Heavy Engg Ltd. | BABCOCK POWER ENVIRONMENTAL INC. | Detailed Engineering, Piping Surge, Stress analysis of CS + RL, FRP Piping |
FGD-Super Thermal Power Project Stage- 1 (260 MW)-KHARGONE | NTPC Ltd | L&T Power | - | Detailed Engineering, Piping Stress analysis of FRP Piping |
FGD-Super Thermal Power Project Stage- 1 (2* 700 MW)- | NTPC Ltd | L&T Power | - | Detailed Engineering, Piping Stress analysis of FRP Piping |
Mundra Thermal Power Plant (5*830MW) | Tata-costal Gujrat Power | TATA Project | ANTRIZ GROUP | Detailed Engineering, Piping Stress analysis of FRP Piping |
FGD Feroze Gandhi, TPS Unchahar (5*210 MW) | NTPC LTD | GE POWER | GE | Detailed Engineering, Piping Stress analysis of FRP Piping |
FGD-Meja Thermal Power Project Phase Stage (2*660 MW) | NTPC LTD | GE POWER | GE | Detailed Engineering, Piping Stress analysis of FRP Piping |
FGD JHAJJAR TPS-Stage I (2*550 MW) | NTPC LTD | GE POWER | GE | Detailed Engineering, Piping Stress analysis of FRP Piping |
SWGD FOR VANPHONG PHAE I Thermal Power Plant (2*660 MW) | Van Phong Power Company Limited (VPCL) | MHPS | MHI | Detailed Engineering, Surge, Piping Stress analysis IFC ISO .Piping Support |
FGD Thermal Power Station Bokaro (500 MW) | DVC | Techno Electric & Engineering | KC Cottrel | Detailed Engineering, Surge, Piping Stress analysis IFC ISO .Piping Support |
Mechanical Scrubbers
Pre - Scrubber
Dryer - Scrubber
Dust & Fume Scrubber
Design Calculation & Nozzle Strength check using FEA analysis
Structural Engineering
GAD
Structural Design & analysis STADPRO
Foundation & Structural Detail drawings
FEA analysis
Static Structural
Thermal analysis
Model & Harmonics analysis to cater for Harmonics loads produced by fan motion/ Mechanical vibrations
Seismic Analysis
Fabrication Detail Drawings
Support design & details drawing
Piping Engineering
Pipe stress analysis of GRP Piping connected to scrubber and ducts (100 Line)
Pipe Stress analysis metallic piping connected to scrubber and ducts
Nozzle Qualification Using FEA analysis